The general objective of S.C. IMUC S.A. PITESTI is to execute fabrication, construction and erection activities of high level quality specified in the designing documentation , norms, standards and contracts for the chemical, petrochemical, energetic and nuclear units.
The policy of S.C. IMUC S.A. PITESTI , within the quality field, expresses the General Director’ engagement related to the implementation and maintaining of the requirements of the Quality Management System during the entire period of activity for fabrication, construction and erection of the products.
S.C. IMUC S.A. PITESTI is authorized and certified for the works executed in the chemical, petrochemical, energetic and nuclear field as follows: 1.SRAC and IQ Net certificate – S.C. IMUC S.A. PITESTI has implemented and maintains a system for Quality Management according to SREN – ISO 9001: 2001 standard. 2.ISCIR authorization no.3/1 for:
- erection of steam and hot water boilers;
- high pressure vessels;
- stem and hot water pipes;
- cranes moving on runways. 3.ISCIR authorization – (no. ICPTCR 14/ TIP A/ 115/ 06.11.2006) for mechanical tests (IM), technological tests (IT) and metallographic analyses (AM). 4.ISCIR authorization, PTPTR 1/ TIP C/ 250/ 07.05.2007 for moving cranes erection and reparation: Q = 100 tones Mmax = 125 tf. 5.ISCIR authorization (no.214, 309, 150 and 404) for non-destructive checks RT, UT, PT, MT. 6.MAPM – CNCAN authorization for the fabrication (no.03-032), construction and erection (03-034) in the nuclear field. 7.MAPM – CNCAN authorization for activities in the nuclear fields and for using and transportation of the radiation sources. 8.MAPM – CNCAN authorization (VI-015) to store the radiation sources (VZ 080/2000).
Convocare AGOA AGEA 06.2013
Acquisitions now with auction portal!
Completed contract - storage of petroleum products-Teius - November 2011
Contract Service Delivery - Cherbourg - France, starting in September 2011 for a period of nine months
Contract in Bilbao, Spain, from December 2011, for a period of three months
Facilities equipment and machinery from its own funds in 2011, the amount of investment reaching 200.000 EURO
Project Completed TULCEA SLAM